06Library · Glossary

Contractor risk, defined.

82 insurance, safety and risk terms in plain English. Each one links to the Library entry that explains it in full, with a worked example and sources.

A

Acclimatization
The gradual build-up of heat exposure that lets the body adapt to hot work. NIOSH recommends new workers start at no more than 20% of a full day's exposure. Read: Heat illness prevention in Arizona
Additional insured
A party added by endorsement to someone else's liability policy, so that policy defends and pays for it on claims connected to the policyholder's work. Read: Additional insured endorsements
Admitted insurer
An insurer licensed by the state, with policy forms and rates filed with the regulator, whose policyholders are protected by the state guaranty fund if it fails. Read: Admitted vs. surplus lines insurance
Aggregate stop
A cap on the total retained losses a policyholder can owe in a policy year under a deductible or retention program. Read: Retention vs transfer: choosing what to keep
Anti-indemnity statute
A state law that voids some indemnity clauses in construction contracts. Arizona's A.R.S. 32-1159 voids clauses that make one party cover another's sole negligence on private work. Read: Indemnity clauses in Arizona construction contracts

C

Certificate holder
The party a certificate of insurance is issued to, usually the general contractor or owner that asked for it. Being the holder does not by itself make that party an insured. Read: Certificates of insurance (ACORD 25)
Certificate of insurance (COI)
A one-page summary, usually on the ACORD 25 form, that shows a policyholder's insurers, policy numbers, dates and limits. It is evidence of coverage on the day it was issued, not a policy, and it grants the holder no rights. Read: Certificates of insurance (ACORD 25)
Class code
A numbered workers' comp classification describing a type of work, each with its own rate per $100 of payroll. In Arizona the classification system comes from NCCI. Read: Workers' comp class codes and payroll
Collateral (letter of credit)
Security, most often a bank letter of credit, that a carrier holds against deductible amounts it has paid or expects to pay but has not yet collected. Read: Deductibles vs self-insured retentions
Competent person
Under OSHA's construction rules, someone able to identify existing and predictable hazards who has authority to take prompt corrective action. Fall training and trench inspections must be done by one. Read: Construction fall protection rules
Completed operations
Claims that arise after the work is finished and turned over, such as a defect that causes injury a year later. Additional insured coverage for it needs its own endorsement, such as ISO CG 20 37. Read: Additional insured endorsements
Construction Focus Four
OSHA's four core construction hazards: falls, struck-by, caught-in or -between, and electrocution. Formerly called the Fatal Four. Read: The Construction Focus Four hazards
Contingent commission
A bonus an insurer pays a broker based on the profitability or volume of the business that broker placed with it. It does not appear on the client's invoice. Read: Broker compensation, fees and taxes
Cost of risk rate
Total cost of risk divided by a measure of business size, most often shown per $1,000 of revenue. It lets a growing business compare years fairly. Read: Cost of risk rates and benchmarks

D

DART rate
Cases with days away, restricted work or job transfer, times 200,000, divided by total hours worked. It measures the more serious recordable injuries. Read: TRIR and DART rates explained
Deductible
The first part of an insured claim the policyholder pays. On liability and workers' comp the carrier usually pays the claim in full and bills the deductible back. Read: Deductibles vs self-insured retentions
Direct cost of an injury
The claim itself: medical bills and wage replacement. Workers' comp pays it unless the business retains it through a deductible or retention. Read: Indirect cost of workplace injuries
Driver qualification file
The record a motor carrier keeps for each commercial motor vehicle driver under 49 CFR 391.51: application, MVRs, road test, annual review and medical certificate. Required at 10,001 pounds in interstate commerce, and at 26,001 pounds for Arizona-only work. Read: Fleet safety and driver qualification files

E

Expected loss
Frequency times severity: how many losses a year multiplied by the average cost of one. Six $5,000 claims a year is $30,000 of expected loss. Read: The frequency–severity matrix
Expense constant
A flat charge added to every workers' comp policy to cover fixed administrative costs. It does not depend on payroll or loss history. Read: How insurance premium is built
Experience mod (EMR)
A multiplier on workers' comp premium comparing your actual losses over three prior policy years with the losses expected for your size and class mix. 1.00 is average; above it is a debit, below it a credit. Read: The experience mod formula
Experience period
The policy years used in an experience mod, generally the three completed years before the current policy. The policy in force when the mod is calculated is left out. Read: What moves the experience mod
Experience Rating Adjustment (ERA)
NCCI's rule that counts only 30% of a medical-only claim in the experience mod, a 70% reduction. Arizona applies it by statute. Read: The experience mod formula
Experience rating worksheet
NCCI's document showing how a mod was calculated: payroll and expected losses by class, every claim with its primary and excess value, the rating values and the final mod. Read: The NCCI experience rating worksheet

F

First aid (OSHA)
A closed list of minor treatments in 29 CFR 1904.7, such as cleaning and bandaging a wound or non-prescription medicine at non-prescription strength. A case treated only with first aid is not recordable. Read: OSHA recordkeeping and the 300 log
Follow form
An excess or umbrella policy that adopts the terms of the policy beneath it for most provisions, so it generally covers what the underlying covers and excludes what it excludes. Read: Umbrella and excess liability insurance
Frequency–severity matrix
A two-by-two grid of how often a loss happens against how large it is. Each box suggests a first treatment: retain, retain and prevent, transfer and reduce, or avoid. Read: The frequency–severity matrix

G

Governing classification
The basic class code that produces the most payroll on a workers' comp policy. Clerical, driver and outside sales payroll is usually rated separately. Read: Workers' comp class codes and payroll
Guaranteed cost
A policy with no meaningful retention: the carrier pays the claims and the policyholder's cost is the premium. Read: Retention vs transfer: choosing what to keep

I

IBNR (incurred but not reported)
An allowance for claims that have happened but are not yet reported, often combined with expected growth on known claims. Read: Loss development factors (LDFs) explained
Incurred losses
Paid losses plus reserves on reported claims, as of a valuation date. The figure underwriters and the experience mod use. Read: Loss runs: how to read one
Indemnity (hold-harmless) clause
A contract promise by one party to pay for and defend another against certain losses. It comes in limited, intermediate and broad forms, depending on how much of the other party's own fault it shifts. Read: Indemnity clauses in Arizona construction contracts
Indirect cost of an injury
What an injury costs the business beyond the claim, such as lost time, overtime, replacement and retraining, supervisor time and damaged property. No policy pays it. Read: Indirect cost of workplace injuries
Indirect cost ratio
OSHA's multiplier for estimating indirect injury cost from direct cost, from 4.5 for claims under $3,000 down to 1.1 for claims of $10,000 or more. Read: Indirect cost of workplace injuries
Inland marine
Insurance for property that moves or is away from a fixed location, such as a contractor's tools, equipment, and materials in transit or on jobsites. Read: Contractor insurance lines explained

L

Large-deductible program
A workers' comp or liability policy with a per-claim deductible in the tens or hundreds of thousands of dollars, usually requiring collateral. Read: Deductibles vs self-insured retentions
Line of coverage
One type of insurance policy within a business's program, such as workers' comp, general liability or commercial auto. Each line pays for a defined kind of loss and is priced on its own exposure. Read: Contractor insurance lines explained
Loaded cost
What an employee actually costs the business: wages plus payroll taxes, benefits and related overhead. Read: Spending to manage risk
Loss development factor (LDF)
A multiplier that carries current incurred losses to their expected ultimate cost, measured from how past years grew between valuations. Read: Loss development factors (LDFs) explained
Loss exposure
Any condition or situation that presents the possibility of a loss, whether or not a loss ever happens. Crews working at height are an exposure; the fall is the loss. Read: Loss exposures: the four classes
Loss pick
An estimate of one future year's expected losses, built from developed past losses and exposure. Also called expected losses. Read: Loss forecasting and the loss pick
Loss prevention
A risk control technique that makes losses happen less often. It works on frequency, for example fall protection or orientation before the first shift. Read: Risk control techniques and risk financing
Loss reduction
A risk control technique that makes a loss cost less once it happens. It works on severity, for example fast injury reporting or a return-to-work program. Read: Risk control techniques and risk financing
Loss run
A carrier's claim-by-claim history for a policy, showing dates, status, paid and reserved amounts, all as of one valuation date. Read: Loss runs: how to read one

M

Manual premium
The premium from exposure times rate, before any adjustment for the business's own loss record or underwriter judgment. For workers' comp it is payroll in each class divided by 100, times that class's rate, summed. Read: How insurance premium is built
Modified duty
Temporary work within an injured employee's medical restrictions, also called light or transitional duty. It is the core of a return-to-work program. Read: Return-to-work programs for contractors

N

Net present value (NPV)
The present value of a control's savings minus the present value of its costs, at the owner's discount rate. Above zero, the control pays at that rate. Read: Cost-benefit analysis of safety spending
Normalizer
A size measure, such as revenue, payroll or hours worked, used to turn a cost total into a comparable rate. It is not itself a cost. Read: Cost of risk rates and benchmarks

O

Ongoing operations
Work that is still in progress. Additional insured coverage for ongoing operations (for example ISO CG 20 10) responds to claims that arise while the job is underway. Read: Additional insured endorsements
OSHA 300 log
The running list of work-related injuries and illnesses that meet OSHA's recording rules, one line per case, kept under 29 CFR 1904 by employers with more than 10 employees. Read: OSHA recordkeeping and the 300 log
OSHA 300A summary
The annual summary of the 300 log, certified by a company executive and posted from Feb 1 to Apr 30. Many construction employers must also file it electronically by March 2. Read: OSHA recordkeeping and the 300 log

P

Payback period
How long until cumulative, undiscounted savings cover a control's cost. It says when the money is back, not whether the investment was worth it. Read: Cost-benefit analysis of safety spending
Personal fall arrest system
An anchorage, connectors and full-body harness that stop a fall in progress. OSHA requires 5,000-pound anchorages per worker and limits free fall to 6 feet. Read: Construction fall protection rules
Premium audit
The carrier's review of actual payroll by class after a policy ends. It settles the premium as additional premium owed or return premium refunded. Read: The workers' comp premium audit
Primary and excess losses
The part of a claim up to the split point (primary) and the part above it (excess). Primary losses drive the experience mod much more than excess losses. Read: The experience mod formula
Primary and noncontributory
Policy wording that makes a sub's policy pay first for an additional insured and bars it from asking the additional insured's own policy to share the loss. Read: Primary and noncontributory insurance
Products-completed operations aggregate
A separate annual limit in a general liability policy for injury or damage arising from finished work and products. Claims from ongoing operations do not reduce it. Read: Commercial general liability (CGL) insurance

R

Recordable case
A work-related injury or illness that results in death, days away, restricted work or transfer, medical treatment beyond first aid, loss of consciousness, or a significant diagnosed condition. It must go on the OSHA 300 log. Read: OSHA recordkeeping and the 300 log
Residual risk
The risk that remains after the controls actually in place. It is compared with inherent risk, the level before any controls, to show what the controls are worth. Read: Risk register and risk appetite
Retained losses
Losses a business pays itself, such as claims inside a deductible or self-insured retention. They are usually grown to their expected final cost before being counted. Read: Total cost of risk (TCOR) for contractors
Retention
Losses a business pays itself, on purpose, through a deductible, a self-insured retention or a budget, usually in exchange for a lower premium. Read: Retention vs transfer: choosing what to keep
Risk appetite
The types and amount of risk a business is willing to accept in pursuit of its goals, best written with numbers so each risk can be tested against it. Read: Risk register and risk appetite
Risk baseline
A frozen, dated record of a business's starting cost of risk, used as the yardstick for every later improvement. Read: Risk baseline and verified savings
Risk control
Techniques that change the loss itself: avoidance, loss prevention, loss reduction, separation, duplication and diversification. Read: Risk control techniques and risk financing
Risk control spend
Money spent to prevent or reduce losses, such as safety training, PPE, inspections and engineering fixes. Read: Spending to manage risk
Risk financing
Techniques that decide who pays for losses that still happen: retention (the business pays) or transfer (insurance or a contract shifts the cost to someone else). Read: Risk control techniques and risk financing
Risk management process
The six-step loop for deciding what to do about possible losses: identify loss exposures, analyze them, examine techniques, select, implement, and monitor and revise. Read: The risk management process, step by step
Root cause analysis
Tracing an incident back past its immediate cause to the management, planning or training gap that allowed it, usually by asking why repeatedly. Read: Incident investigation and root cause analysis

S

Schedule credit or debit
A percentage an underwriter subtracts from or adds to premium for documented risk features the experience mod does not capture, within limits in the carrier's filing. On general liability it is often called IRPM. Read: How insurance premium is built
Self-insured retention (SIR)
An amount the insured pays and handles itself before the policy responds at all. Coverage applies only above the retention. Read: Deductibles vs self-insured retentions
Split point
The dollar line that divides each claim into primary loss (counted in full in the mod) and excess loss (discounted). NCCI sets it by state, and it is printed on the experience rating worksheet. Read: The experience mod formula
Stamping fee
A filing fee charged on surplus lines policies by the association that processes them for the state. In Arizona it is billed separately and is not subject to the surplus lines tax. Read: Admitted vs. surplus lines insurance
Statutory employer
A business the law treats as the employer of a contractor's or subcontractor's workers for workers' comp. In Arizona the rule is A.R.S. § 23-902(B). Read: The workers' comp premium audit
Subcontractor prequalification
The review a general contractor completes before hiring a sub: license, insurance and endorsements, safety record, safety program, financial capacity and experience. Read: Subcontractor prequalification
Subrogation
An insurer's right, after it pays a claim, to recover that money from whoever caused the loss. Read: Waiver of subrogation explained
Surplus lines (E&S) insurance
Coverage from an insurer not licensed in the state, placed through a licensed surplus lines broker for risks the admitted market will not write. It has no guaranty fund backing and carries a state tax. Read: Admitted vs. surplus lines insurance
Surplus lines tax
A state tax on surplus lines premium, collected from the insured by the broker. In Arizona it is 3% of gross premium including policy fees, excluding stamping fees (A.R.S. § 20-416). Read: Admitted vs. surplus lines insurance

T

Total cost of risk (TCOR)
Everything a business pays or loses in a year because risk exists: premiums, taxes and fees, retained and uninsured losses, injury costs, and what it spends to manage risk. Read: Total cost of risk (TCOR) for contractors
TRIR (total recordable incident rate)
Recordable cases times 200,000, divided by total hours worked. It reads as recordable injuries per 100 full-time workers per year. Read: TRIR and DART rates explained

U

Uninsured losses
Losses no insurance policy responds to, paid entirely by the business. Read: Total cost of risk (TCOR) for contractors

V

Verified savings
Savings backed by a third-party document, such as a premium audit statement, renewal quote or experience mod worksheet, as opposed to a projection. Read: Risk baseline and verified savings

W

Waiver of subrogation
An agreement, carried out by policy endorsement, that the insurer will not seek to recover a paid claim from a named party, such as the general contractor or owner. Read: Waiver of subrogation explained

Want this run for your company?

Approved Frost agents deliver full-service fractional risk management on Frost: your total cost of risk, a plan with owners and documented savings, at a fraction of the cost of a risk department.

Find an approved agent