Picture a Monday morning.
The owner's phone rings at 6:05. It's the foreman.
"Your best finish carpenter is done. Took a job across town."
He knew every shortcut that was safe and every one that wasn't. He trained the last three new guys.
By Wednesday there's a new name in his spot. Somebody new. Starting at zero.
Why turnover raises your risk
Owners say the same thing almost every week: "We can't find enough good people."
They're right. Add a second sentence: every time a good person leaves, your risk goes up. Not your HR budget. Your risk.
Here's why. The seat he left doesn't stay empty. You fill it with someone new, and that someone is a first-year worker, starting the clock over on the most dangerous stretch of the job.
44% of construction injuries happened to workers in their first year on the job, and those injuries drove 47% of construction workers' comp claim costs (Travelers 2026 Injury Impact Report, 1.2 million+ claims, 2021 to 2025).
Now multiply that by every seat that turns over in a year. That's why the first year on the job deserves its own plan.
What does employee turnover really cost?
Turnover belongs in your cost of risk. Of everything in internal risk management, the people and time that keep risk under control, workforce turnover is the most important measure.
Here's what it costs beyond the job posting:
- More first-year workers on site, and more of the injuries that come with them
- Supervisors training instead of running the job
- Crews that never find their rhythm because the lineup keeps changing
- Safety habits that walk out the door with the people who had them
None of that shows up on an insurance quote. All of it shows up in your total cost of risk, and every dollar of it comes out of net operating income.
And the owner feels it. You did everything right to grow, and the growth keeps leaking out the back door. It's exhausting to rebuild the same crew every year.
Good companies shouldn't have to start over every Monday.
How do you calculate your churn?
Take your headcount from 12 months ago and your headcount today. Count every person you hired in between.
If you hired more people than you grew, the difference is your churn. Each one was a first-year worker on your job site.
Write the number down. It's the start of your scoreboard. Put it next to your cost of risk per $1,000 of revenue and track both every quarter.
Seats, not people
One idea changes how to think about this. A seat is a role, not a person. People change. The seat and its responsibilities stay.
In a Frost risk plan, every responsibility belongs to a seat: Owner, Safety lead, Superintendent, Office manager, Fleet, Claims contact. If the person in a seat leaves, the work doesn't leave with them. Someone new sits down, and the job is still written down on a one-page risk plan.
That protects you at the top. It doesn't fix turnover on the crews. For that, you need a different kind of plan.
How to reduce turnover on your crews
- Know your numbers: how many people you hired last year, and how many are still with you
- Make the first 90 days a real plan, with a mentor by name
- Show people a path up in their first year, not their fifth
- Ask the people who stay why they stay, and do more of that
None of these cost much. What they need is an owner. Put each one in a seat, give it a date, and check it every 90 days like any other part of the plan. If nobody owns retention, it belongs to the once-a-year system by default, and that system only looks at it when the renewal comes in.
People stay where they can see a future. Every person who stays is one fewer first-year worker next year.
A workforce vision: 30x4
I grew up with a single mom. Life sometimes felt impossible, but I always had someone in my corner. Many young adults aging out of foster care don't. Many are ready to work hard. What they often don't have is a door, a path up and people around them when life outside work gets heavy.
Contractors need good people who stay. Two problems. One answer, if we build it right.
30x4 is the vision I'm building toward: a national network of 30 leaders in contracting, each generating about 30 career starts a year at $30,000 or more, about 900 careers and $30 million in annual wages, fully rolled out by 2030. Employers bring the job, the training and the path up. Nonprofit partners help with housing, transportation, mentoring and documents. It's measured on retention, advancement and wage growth, not on how many people got hired.
This is not a charity placement program. It's a workforce plan that makes job sites safer and steadier. It's also at the beginning: a vision with targets, and I'm building the first relationships with employers and nonprofit partners now. — Brandon Junkin, founder of Frost
What's at stake
Leave turnover alone, and Monday at 6:05 keeps happening. Another call. Another new name. Another first year starting over on your job site.
Work on it, and the phone call changes. The crew stays together long enough to get good. Habits stay in the building. New people come in with a mentor and a path.
From rebuilding crews to growing them.
Where to start
Ask your broker or risk advisor to put turnover on paper next to your injuries and your insurance. From there, a Baseline adds up what risk really costs you, turnover included, and a 90-day plan puts an owner and a date on every task, with signed proof of every saving. Approved Frost agents run this kind of program for contractors, start to finish.
The reference entries behind this page: definitions, the math and the sources.
Total cost of risk (TCOR) for contractorsIndirect cost of workplace injuriesSpending to manage riskWhat moves the experience modBrowse the whole Library →Quick answers
Is employee turnover part of the cost of risk?
Yes. Turnover puts more first-year workers on site, pulls supervisors into training and takes safety habits out the door. Those costs land in your cost of risk even though they never appear on an insurance quote.
How do I measure turnover simply?
Compare your headcount 12 months ago to today and count everyone you hired in between. If you hired more people than you grew, the difference is your churn.
Is 30x4 already placing workers?
No. 30x4 is a vision in its early days. Frost's founder is building the first relationships with employers and nonprofit partners now.